Languages / DL-03
DL-03 . Ancient Greece . adopted

LOGOS

Evidence before opinion.

Logic and evidence. Related traditions: Nyaya, Burhan.

READINESS . WEEK 28 System D pairs 41% progress with 63 open punch items Evidence before opinion . LOGOS on deep-dive analysis 0 20 40 60 80 0 20 40 60 80 100% A B C D E F G H Claim: low progress pairs with deep punch. Evidence: 8 systems plotted, D flagged. Next: split D's 63 items by cause. Source: sample dataset v1, 2026-07-12 . Open Visualization Protocol, DL-03 LOGOS

Design laws

  • Every chart proves one claim
  • Annotation over legends
  • Sources always visible
  • Titles make arguments
  • Decoration never competes with evidence

Constitution

The deterministic communication contract: these values are schema-enforced and validator-checked, not styling suggestions.

narrative styleevidence-first
densityscientific
annotation policyguided
legend policydirect-labels-only
highlight policysingle
decision styleevidence-only
reading timesession
charts per page3

Occasions

deep-dive analysismonthly chartbooksadvisory notes

Chrome

kicker bar and CAPS eyebrow.

Palette

RoleHex
background#FDF4EA
ink#262A33
body#4A4E57
hairline#E8E0D4
gridline#E8E0D4
primary#9E2B25
muted#B8B2A7
positive#2E6E4E
negative#9E2B25

Fonts

Display: 'Oswald','Arial Narrow',Arial,sans-serif, weight 700.
Body: 'Segoe UI',Arial,sans-serif, weight 400.

Voice

How a page in this language reads. The universal prose laws (FN-07) apply first, then this register. The validator checks that the block below obeys its own caps.

DL-03 LOGOS Evidence before opinion.

The essayist analyst. LOGOS is the one language that writes in dense prose: full sentences that argue, in the tradition of the printed chartbook. The title states a claim, the paragraph proves it, the source sits beside it. Causal connectives are the product here, because the reader came for the because.

register: analytic prosemood: argumentative declarativehedging: allowed when it states the confidencesentence cap: 25 wordstitle cap: 14 words
Title grammar
The claim as an assertion, with the cause in a subordinate clause.
Freight cost peaked in March because the joints shipped by air
Do
  • Use causal connectives: because, despite, which explains.Analysis without causality is a table read out loud.
  • Cite the source next to the claim, never in an appendix.The language's law is that sources stay visible; the prose obeys the same law.
  • Keep exact figures where they carry the argument.In a deep dive, 18.3% and about 18% are different claims.
Do not
  • Never flag your own findings as worth attention."Interestingly" and "notably" ask the reader to be impressed. Show the anomaly instead.
  • No assertion without its evidence in the same breath.An unanchored claim breaks the core contract of this language.
  • No bullet fragments in body text.LOGOS argues in sentences. Fragments belong to KATA and NOROSHI.
The same point, two voices
Generic machine prose

The data shows an interesting trend in freight volumes that is worth examining in more detail.

LOGOS

Freight volume fell 18% after April, when cable moved from air to sea (packing lists, weeks 14 to 22).

The language in use

Six chart objects rendered from the same golden data as every other language. Only the token file differs.

CH-RNK-01 BAR-H
OPEN ITEMS . WEEK 28 Electrical holds 34 of 109 open items, the largest single backlog Electrical 34 items Mechanical 28 Piping 21 Instrumentation 17 Civil 9 Source: sample dataset v1, 2026-07-12
CH-TIM-01 LINE
PROGRESS . H1 2026 Actual progress reached 62% in June, 9 points behind plan 0 20 40 60 80% Jan Feb Mar Apr May Jun Plan Actual gap widens from April Source: sample dataset v1, 2026-07-12
CH-PTW-01 STACKED BAR
PIPELINE . WEEKS 25-28 Delivered goods reached 1,284 in week 28, 90% of all items 1036 items W25 1127 W26 1257 W27 1421 W28 Delivered In transit Pending Source: sample dataset v1, 2026-07-12
CH-DEV-04 SURPLUS/DEFICIT AREA
OUTPUT VS PLAN Output ran 8% under plan at the June trough -15 -10 -5 +5 +10 +15% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Source: production ledger, Dec
CH-DST-07 BEESWARM
OPEN LOTS One lot sits at 62 days, twice the next slowest Lot 88 62 days 0 20 40 60 80days Source: customs log, wk 28
CH-TAB-01 STATUS MATRIX
READINESS . WEEK 28 Two of five systems are handover-ready; System D is critical in test INSTALL TEST PUNCH HANDOVER System A COMPLETE COMPLETE COMPLETE COMPLETE System B COMPLETE COMPLETE COMPLETE COMPLETE System C COMPLETE ON TRACK WATCH - System D COMPLETE CRITICAL - - System E ON TRACK WATCH - - Source: sample dataset v1, 2026-07-12